Signal Report Date: Jan 12 2026
Rating of: Evaluation of CAE_Droptest_02
Report of Signal 2 of Load Case 2: 00SENS010000VEZC
Overall Rating: 0.7406
Versuchskurven Vergleich Versuch-Berechnung

droptest_01
Average of experiments

droptest_02
cross-correlation reference

cae_droptest_02

Limits Outer corridor

Limits inner corridor
Method Name Rating Weight
1 Corridor Method 0.6437 0.50
2
Correlation Method
Value Rating Weight
Cross correlation function 0.9995 0.9973 0.50
Size 0.6142 0.6142 0.250
Phase shift 0.2 0.7413 0.250
0.8375 0.50
3 Combination of 1 and 2 0.7406 -
Parameters: Evaluation Intervall: 1.4 - 6.7
Method 1: Max. half width of inner corridor: 0.050
Max. half width of outer corridor: 0.50
Corridor curve file:
Reference value: 6.0445
Transition exponent: 2
Method 2: Limits for phase shift: 0.1 - 0.6
Rating exponents (shape, size, phase): 10, 1, 1
Previous Signal Up to Loadcase Up to Summary